BUILDING MATERIALS. Mortar/plaster: 8 frr., 0.26 kg. Tile/brick: 11 frr., 1.78 kg (including several in greenish yellow early Corinthian fabric, e.g. KA067).
Contents of Unit
POTTERY. Roman (9 frr., 0.28 kg): nondiagnostic, including 5 body sherds with mortar.
Explanation of deposition
Mixed colluvium and dense debris from collapse of building above dromos of Tomb 10.
Location in unit
Inside niche in west wall of building over dromos of Tomb 10.